Chenggong Avenue, Anyuan Industrial Park, Anyuan District, Pingxiang, Jiangxi, China

Trade Terms & How to Request a Quote

What is confirmed in a quotation, what to send us, and what we deliberately do not publish.

In shortThis is a quotation-based export site with no checkout and no published price list. MOQ, lead time, Incoterms, payment terms and the document set are confirmed in writing for each enquiry. We do not publish figures that have not been verified for our own production and shipping arrangements.

1. What every quotation states

A quotation is the only document that fixes commercial terms for an order. The table below says what gets decided there, so an enquiry can be compared across suppliers on the same basis.

ItemWhat determines itWhere it is fixed
MOQDepends on product type and sizeStated in your quotation
Lead timeDepends on standard vs custom specification and production scheduleStated in your quotation
IncotermsFOB / CFR / CIF discussed under Incoterms 2020Named port and cost split in the quotation
PaymentAgreed per orderTerms and bank details in the quotation
PackingWoven bags, jumbo bags, palletised loads, wooden cases, framed cratesDocumented with photographs
DocumentsInvoice, packing list, CO / FORM E / RCEP, COA where available, IPPC for solid woodConfirmed for the destination before shipment
InspectionDimensions, bulk density, composition, crushing strength where applicableMaterial data scope

2. Industry practice — reference only

The points below describe how export orders in this industry are commonly structured. They are not Jingpeng's published terms and must not be read as an offer. Only a written quotation from us sets the terms for your order.

Source note: this section describes general trade practice and a competitor's public wording, not a capability or commitment of Jiangxi Jingpeng Environmental Protection Materials Co., Ltd. It is included so buyers know which questions to ask, not to imply we have adopted another supplier's terms.

3. What to send us for a quotation

The enquiry form asks for these fields. Sending them together avoids a second round of clarification:

4. What we deliberately do not publish

Prices, MOQ figures, lead-time numbers, credit terms, UL / CE / PED certificate numbers, named overseas project references and dated performance results are not on this site. They will be added when the underlying documents exist. Our editorial and review policy explains why.

Frequently asked questions

Do you publish a price list or MOQ?

No. MOQ depends on product type and size and is stated in the quotation for your enquiry. This site has no checkout and no published price list.

What is the lead time?

Lead time depends on the product, size and whether the item is a standard or custom specification. We state it in the quotation rather than publishing a general number that may not apply to your order.

Which Incoterms do you work with?

FOB, CFR and CIF can be discussed under Incoterms 2020. The named port and the division of costs are written into the quotation so both sides quote the same basis.

What payment terms do you accept?

Payment terms are agreed per order and stated in the quotation. T/T and L/C are commonly discussed for export orders; nothing on this page is an offer of credit terms.

Which documents can accompany a shipment?

Commercial invoice, packing list, certificate of origin (CO / FORM E / RCEP where applicable), batch COA where available, and IPPC treatment evidence for solid-wood packing. Confirm the required set before ordering.

Can I get a packing-selection calculation?

Send the duty data listed in our selection guide and we can help shortlist a packing type. We do not publish hydraulic calculation or HETP reports as a standard service.