In shortJingpeng has delivered PC / general-contracting projects in coking, steel, sulphur recovery, industrial wastewater, circulating water, landfill leachate and VOC treatment. The cases below give the scope and measurable parameters recorded in our corporate handbook, with the source page for each.

Engineering references

Coking / tower overhaul

No. 2 desulphurisation tower overhaul — Shandong, 2025

Ceramic-plastic packing supplied for the overhaul of a No. 2 desulphurisation tower in the phase II chemical recovery workshop of a coking plant.

Industry
Coking / chemical recovery
Scope
No. 2 desulphurisation tower overhaul
Product
Ceramic-plastic packing
Quantity
700 m³
Nominal block height
100 mm (per technical agreement)
Date
Purchase order dated 14 April 2025
Source
Purchase order on file; client name and commercial terms withheld
Coking / sulphur recovery

Claus sulphur recovery system — Shougang Group

EPC / turnkey contract for a Claus sulphur recovery system, listed among the company's general contracting references.

Client
Shougang Group
Scope
Claus sulphur recovery system, general contracting
Contract type
General contracting (PC / EPC as stated in handbook)
Source
Corporate handbook, p.17–18
Steel / coking

Xinyu Steel — desulphurisation, benzene wash & acid plant

Fine desulphurisation tower, desulphurisation / benzene washing / ammonia stripping / phosphoric acid ammonia washing, delivered under general contracting.

Client
Xinyu Steel (新余钢铁)
Scope
Fine desulphurisation tower; desulphurisation, benzene washing, ammonia distillation, acid plant
Contract type
General contracting
Source
Corporate handbook, p.17–18
Coking project

1.5 million t/a coking project — chemical recovery packages

Vacuum potassium carbonate desulphurisation, Claus sulphur recovery and fine desulphurisation packages within a 1.5 Mt/a coking project.

Industry
Coking
Capacity
1,500,000 t/a coking project
Packages
Vacuum K₂CO₃ desulphurisation PC; Claus sulphur recovery PC; fine desulphurisation PC
Source
Corporate handbook, p.19
Water treatment

Coking wastewater — ozone filter package

Ozone filter equipment for coking wastewater, three units operating in parallel.

Equipment
Ozone filter package
Capacity
150 m³/h per unit
Configuration
3 units in parallel
Medium
Coking wastewater
Contract type
PC
Source
Corporate handbook, p.21
Water treatment

Waste heat workshop — circulating water filtration

Ozone filter package for circulating water, five units operating in parallel.

Equipment
Ozone filter package
Capacity
100 m³/h per unit
Configuration
5 units in parallel
Medium
Circulating water
Source
Corporate handbook, p.22
Water treatment

Landfill leachate — ceramic membrane system

Ceramic membrane filtration system for a municipal solid waste leachate treatment plant.

Equipment
Ceramic membrane filtration system
Capacity
10 m³/h
Medium
Landfill leachate
Contract type
PC
Source
Corporate handbook, p.25
Air / VOC

Desulphurisation & denitrification — membrane filtration scope

Membrane filtration system including 2 ceramic membrane filters, 1 FRP vessel, 30 valves, piping, electrical and instrumentation.

Equipment
Membrane filtration system
Components
2 ceramic membrane filters, 1 FRP unit, 30 valves, piping, E&I
Contract type
PC (supply + installation)
Source
Corporate handbook, p.20
Air / VOC

Ultra-low emission VOC treatment

VOC collection and treatment for gas from condensation/benzene, tank farm and desulphurisation water systems.

Scope
Gas collection from condensation, crude benzene, tank farm and desulphurisation water systems
Contract type
PC (supply + installation)
Source
Corporate handbook, p.26

What is deliberately not claimed

Project dates, client-issued performance acceptance figures and third-party audit results are not stated in the source handbook, so they are not published here. If you need a reference letter, completion certificate or acceptance report for a specific project, request it through the contact page.

Project site photographs

Installation and operating sites where tower packings and column equipment are used. These photographs show customer project sites, not our own factory, and are published without client names or project labels.

Four stainless steel towers under erection at a customer project site
Four stainless steel towers under erection at a customer project site
Tower packing installation inside a steel support structure
Tower packing installation inside a steel support structure
Two tall absorber columns with large-diameter pipework
Two tall absorber columns with large-diameter pipework
Process unit with green columns, pipe racks and stack
Process unit with green columns, pipe racks and stack
Overview of a chemical process unit and tall columns
Overview of a chemical process unit and tall columns
Stainless steel tower section being positioned by crane
Stainless steel tower section being positioned by crane
Three towers during erection with scaffolding and protective mesh
Three towers during erection with scaffolding and protective mesh
Stainless steel column alongside a plant building
Stainless steel column alongside a plant building
Two packed towers under construction
Two packed towers under construction
Close-up of a tower shell and lifting arrangement
Close-up of a tower shell and lifting arrangement
Photo note: no photograph on this page is assigned to a named case above. Site photographs carry no project identification in the source material, so we do not create a link that cannot be verified. See packaging & delivery for how the products are prepared for shipment.

Frequently asked questions

Which industries has Jingpeng worked in?

The handbook records projects in coking, steel, sulphur recovery, industrial wastewater, circulating water, landfill leachate and VOC / ultra-low emission treatment.

What contract model do you work under?

Most listed projects are PC (supply plus installation) or general contracting / EPC. Cooling tower repair and maintenance are supplied on a custom, one-stop basis.

Do you publish client names and dates?

We publish the client names that appear in our corporate handbook, such as Shougang Group and Xinyu Steel. The handbook does not state project dates, so we do not assign dates here.

Can I verify the capacity figures?

Each case lists the handbook page and the measurable parameters (m³/h, number of units, medium). Ask us for the corresponding project documentation when you enquire.